በአማርኛ   English
Home    |    About us     |    Services    |    Trainings     |    Projects    |    Contacts    
Amharic
English  
 
Ruhe Logo
 
 
       
  SEARCH
RUHE LONG AND FLAT PRODUCTS CONSULTANCY PLC RUHE LONG AND FLAT PRODUCTS CONSULTANCY PLC RUHE LONG AND FLAT PRODUCTS CONSULTANCY PLC RUHE LONG AND FLAT PRODUCTS CONSULTANCY PLC RUHE LONG AND FLAT PRODUCTS CONSULTANCY PLC RUHE LONG AND FLAT PRODUCTS CONSULTANCY PLC

Ruhe Long and Flat Products Consultancy PLC
SHORT TERM ON-JOB TRAININGS SCHEDULED FOR THE YEAR 2012/13 (2005 EC)

No.
Topics
Target groups
Training out comes
Contact hour

1

Minimizing tube production cost through quality manufacturing process
  • Forman
  • Production Supervisors
  • Mill Operators
  • Design experts
  • Quality inspectors
  • Marketing and sales personnel
  • Warehouse managers
  • Identifying quality parameters of tubular products
  • listing interrelation of quality,market and Profitability
  • Analyzing major quality problems in relation with customers' need
  • Identifying precautions to be taken in phases of raw material purchase, storing, transporting manufacturing,and distribution
  • Listing short and long term impacts of product quality problems on profitability and over all industrial performance
  • Explaining the role of operators and supervisors on keeping product quality
  • Listing various phases or steps of quality inspection in the manufacturing process of tubes/pipes
  • Identifying cost parameters in relation with product quality
  • Listing production precautions in the phases of slitting, die-changing, machine set-up,product collection, loading and un-loading
  • Building positive attitude towards all rounded industrial measures for quality and productivity improvements

26

2

Basic concepts on quality parameters of reinforcement bars
  • Forman
  • Production Supervisors
  • Mill Operators
  • Design experts
  • Quality inspectors
  • Marketing and sales personnel
  • Warehouse managers
  • Identifying quality parameters of reinforcement bars products
  • listing interrelation of quality,market and Profitability
  • Analyzing major quality problems in relation with customers' need
  • Identifying precautions to be taken in phases of raw material purchase, storing, transporting manufacturing,and distribution
  • Listing short and long term impacts of product quality problems on profitability and over all industrial performance
  • Identifying cost parameters in relation with product quality
  • Explaining the role of operators and supervisors on keeping product quality
  • Listing various phases or steps of quality inspection in the manufacturing process of reinforcement bars
  • Listing production precautions in the phases of slitting, die-changing, machine set-up,product collection, loading and un-loading
  • Building positive attitude towards all rounded industrial measures for quality and productivity improvements

26

3

Quality door/window assembly and manufacturing process and its economics
  • House Agency Experts
  • Small & middle Enterprises' experts,members and unions
  • Forman
  • Production Supervisors
  • Design experts
  • Quality inspectors
  • Marketing and sales personnel
  • Warehouse managers
  • Identifying quality parameters of door and window products
  • listing interrelation of quality,market and Profitability
  • Analyzing major quality problems in relation with customers' need
  • Identifying precautions to be taken in phases of raw material purchase, storing, transporting manufacturing,and distribution
  • Listing short and long term impacts of product quality problems on profitability and over all industrial performance
  • Identifying cost parameters in relation with product quality
  • Explaining the role of operators and supervisors on keeping product quality
  • Listing various phases or steps of quality inspection in the manufacturing process Quality door/window
  • Listing production precautions in the phases of welding, die-changing, machine set-up,product collection, loading and un-loading
  • Building positive attitude towards all rounded industrial measures for quality and productivity improvements

26

 

   Terms of Service    |    About Us     |     Contacts
   © 2010 Ruhe Consultancy PLC.
 
Designed By: Hosthabesha.com